Loyd Engineering Company

Manufacturer of water-tube boiler & heat exchanger

Retube one Boiler in Shazand(Arak) Petrochemical co.

Retubing of one set Boiler( 85-ton) shazand petrochemical project
FABRICATION OF SUBSET BOILER AND MATERIAL USED:
- FURNACE FRONT SIDE WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- FURNACE REAR SIDE WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- FURNACE LEFT SIDE WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- FURNACE REAR SIDE WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- REAR WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- -SUPER HEATER TUBE : TUBE: Ø38.1x3.5 MAT:SA213 T12
- PIPE:Ø273x21 MAT:A335 P22
- ECONOMIZER : Ø38.1x3.5 MAT:SA192
- BANK TUBE: Ø50.8x3.5 MAT:SA192
- SEEAM AIR HEATER
- SILENCER
WORKING PRESSURE: 54 BAR
shazand-04.jpg
shazand-02.jpg
shazand-01.jpg
Contact info

Tehran office:

No 5 ,Second floor , no105,south bahar, Tehran, Iran

Factory Address:

West Talashgaran, Talash Blvd., Kheirabad Industrial Town, Arak,Iran
Phone: 086-33553254-5
Fax: 086-33553256
info@loydco.com
Latest Projects

Neka Power Plant

Neka Power plant, overhaul for evaporator

Keshto sanat Haft Tapeh Ahvaz

Keshto sanat Haft Tapeh Ahvaz, manufacture superheaters for Boiler

Neka Power Plant

Neka power plant, manufacture bundels for Reheat Boiler

2017-Loydco / All Rights Reserved.