Loyd Engineering Company

Manufacturer of water-tube boiler & heat exchanger

Purchase buy and supply material ,fabrication ,installation of primary,medial,final superheater and side water wall tube Bandar abbas power plant

Purchase buy and supply material ,fabrication ,installation of primary,medial,final superheater and side water wall tube Bandar abbas power plant
SPECIFICATION TUBES:
- PRIMARY SPERHEATER TUBE:TUBE Ø35x5.6 MAT:10.CD9.10
- SECONDARY SPERHEATER TUBE:TUBE Ø54x9 MAT:A213 TP321H
- TUBE Ø51x6.3 MAT:A213 TP321H
- TUBE Ø51x8 MAT:10.CD9.10
- TUBE Ø44.5x10 MAT:10.CD9.10
-HT-FLUID FLOW RATE:1821 m3/h
- FINAL SPERHEATER TUBE:TUBE Ø54x9 MAT:A213 TP321H
- TUBE Ø51x7.5 MAT:A213 TP321H
- MAKE:WEISHAUPT
- TUBE Ø51x8 MAT:10.CD9.10
- TUBE Ø44.5x10 MAT:10.CD9.10
- PANAL WATER WALL : TUBE Ø44.5x6 MAT:A213 T11
- APPROXIMATE WEIGHT:350 TON
WORKING PRESSURE:210 BAR
bandar-abbas-power-plant-05.jpg
Contact info

Tehran office:

No 5 ,Second floor , no105,south bahar, Tehran, Iran

Factory Address:

West Talashgaran, Talash Blvd., Kheirabad Industrial Town, Arak,Iran
Phone: 086-33553254-5
Fax: 086-33553256
info@loydco.com
Latest Projects

Neka Power Plant

Neka Power plant, overhaul for evaporator

Keshto sanat Haft Tapeh Ahvaz

Keshto sanat Haft Tapeh Ahvaz, manufacture superheaters for Boiler

Neka Power Plant

Neka power plant, manufacture bundels for Reheat Boiler

2017-Loydco / All Rights Reserved.