Loyd Engineering Company

Manufacturer of water-tube boiler & heat exchanger

Purchase and Retube two Boiler in Kharg Petrochemical co.

Supply of materials and retubing two set Boiler Kharg Petrochemical CO(turnkey)
SPECIFICATION TUBES USED:
- BANK TUBE :Ø 63.5x2.6 MAT: SA 192(SWAGE 63.5 TO 50.8)
- FURNACE WALL TUBE :Ø 76.5x3.5 MAT: SA 192(SWAGE 76.2 TO 50.8)
- FURNACE LEFT SIDE WATER WALL TUBE: Ø76.2x3.5 MAT:SA192(SWAGE 76.2 TO 50.8)
- SUPER HEATER TUBE :Ø 50.8x5.6 MAT: SA 213 T11& 15MO3
WORKING PRESSURE: 25 BAR
kharg-01.jpg
shazand-02.jpg
shazand-01.jpg
Contact info

Tehran office:

No 5 ,Second floor , no105,south bahar, Tehran, Iran

Factory Address:

West Talashgaran, Talash Blvd., Kheirabad Industrial Town, Arak,Iran
Phone: 086-33553254-5
Fax: 086-33553256
info@loydco.com
Latest Projects

Neka Power Plant

Neka Power plant, overhaul for evaporator

Keshto sanat Haft Tapeh Ahvaz

Keshto sanat Haft Tapeh Ahvaz, manufacture superheaters for Boiler

Neka Power Plant

Neka power plant, manufacture bundels for Reheat Boiler

2017-Loydco / All Rights Reserved.